Kamrodder :- Join rods and introduce them into the sewer line through the manhole until they reach the choke/ blockage. Now dechoke / break blockage by rotating rods using rod turner. Once the choke is broken water level recedes, retrieve the rods back and separate them.
http://www.theplumbing.net
No comments:
Post a Comment