Demolition is to start tomorrow & will last 2 days. Everything in the bathroom will be removed & hauled to the dump by the contractor. The sink and fixtures for the tub, shower & sink are the only things which won't be replaced. The price includes reinstallation, replacing copper lines & joists, painting walls & ceiling. Greenboard is to be used behind the tub & Hardiboard thinset to subfloor & screwed to subfloor. The entire job will last two weeks. Barbara, the tub will be cast iron. Unfortunately, there aren't alot of people who do vinyl floors (which is what we were going with originally). We searched for several months before finding his one.We got estimates for both vinyl and ceramic tile. There was only $100 difference. So we went with the ceramic tile. The contractor has been in busiess for over 20 years and is licensed, bonded & insured.
No comments:
Post a Comment